Enichem Assemini

  • Study for reclamation and decommissioning of mercury with chlorine removal method and cost of implementation.

  • Verify structural steel plant project with Tri-membering to substitute checks and modified structure.

  • Assistance to the assembly plant chloro-membrane cell recovery and verification phase 1.

  • Check stability of the spine T-404 Plant VCM / 2 with full structural check the second half. the elem. finished.

  • Detailed design of modified transfer line dichloro-ethane fi 12 "root dock to platform B.

  • Replacing dilators lines propylene and ammonia storage facilities in the coastal boardwalk with calculation of stress-analysis.

Tags: , , ,

Demolizione e bonifica Impianto 2/9 - 2/18 vista da Sud Capannone incendiato Sistemazione finale dell'area Installazione nuovo Silo IPA Demolizione dell’ ex-impianto Filatura Fiocco Inquadramento Geografico ex Cracking di Uta Demolizione dell’impianto di Raffinazione Elettrolitica e bonifica delle aree Demolizione ex impianto Fibre Acriliche