Polymers Europe - Porto Torres

Verification and certification of compliance of fire resistant coatings, fire extinguishing systems and gas detectors Gods.


Design and treatment plant designs for soda off.


Identification and study of product lines and utilities department for fluid distribution.


Detailed engineering, materials list and sketches of assembly lines connecting drains Benzene recovery.


Safety interventions on the dock.


Professional service for the optimization of the chemical-physical treatment of primary water DEMI / 3.


Processing documentation for Certification Emission Trading 2009.


Assistance to the three-year renewal for certification of the environmental system.


Project Offices-conditioning plant room control-room Polythene Plant Protection-HD.


Project Plant Conditioning Zone HD Polythene Granulation Plant.


Security Coordination (Title IV-Decree 81/2008) of the Metro Boiler C14.


Security Coordination (Title IV-Decree 81/2008) of the maintenance work of the Park Ball G Ball S107 ethylene plant.


Security Coordination (Title IV-Decree 81/2008) of the aromatic plant stopped work.

Tags: , , , , , ,

Sistemazione finale dell'area Demolizione impianto Solfato di Titanile - vista da Ovest Demolizione e bonifica Impianto 2/38 vista da Est Demolizione dell’ ex-impianto Filatura Fiocco Demolizione impianto Solfato di Titanile - vista da Nord-Ovest Capannone incendiato Demolizione e bonifica impianto Demi 2 - vista Sud/Est Impianto Biossido di Titanio - vista da Est

Translator

Users Online