Portovesme SRL - Portovesme
![]() | ![]() |
Design, Supervision and Coordination Safety ex-DD.LLgs.494/96 and 528/99 for work:
- 3 ° bank Landfill 2B Genna Luas (work duration 12 months)
- 4 ° bank Landfill 2B Genna Luas (duration 12 months work)
- 5 ° bank Landfill 2B Genna Luas (work duration 12 months)
- 6 ° bank Landfill 2B Genna Luas (duration 12 months work)
-7 ° bank Landfill 2B Genna Luas (duration 12 months work)
Design, Supervision and Safety coordination and ex-DD.LLgs.494/96 528/99 for work:
Shed construction-ex-Ferrites




