Syndial - Assemini
Project of securing warehouse fire former industrial polystyrene. 
Verification of stability of the support structure of the cooling tower; designing the intervention of recovery of some structural elements damaged because of not proper functioning of the expansion joints of the said tower.
Calculated structure of the mobile bell of the gasometer from mc 500 chlorine plant.
Determination of areas of danger of explosion chlor-alkali plant with its Technical Report and drawings.
Test stability of containment basins and tank farm facility dichloroethane coastal deposit.
Check disposal capacity of the sewer plant and tank farm of dichloroethane coastal deposit.
Project of securing and restoring the structure of the dock Syndial.
Calculations of stress-analysis of lines of dichloroethane and soda.
Design pressure (monitored the presence of chlorine in ambient air) and cooling of the plant control room dichloroethane.
Design-vent stack for emergency venting to the atmosphere of the system HCl-synthesis.
Expansion project, and covered loading ramp system VCM-2.
Security coordinator for planning and running (D. Lgs.81/2008 and 106/2009 pursuant to Legislative Decree 494/96 and 528/99), for the execution of the work of "Activities of Reclamation, Demolition and Disposal Cracking of the inactive plants, peroxides and Buildings residues of Acrylonitrile-1 2 ° STEP ".
Design, construction management and Works Manager running (Title IV-DD. Lgs.81/2008 and 106/2009) of the work of "asbestos remediation and demolition of buildings and structures of the former UTA-cracking plant."
Works Management and Construction Manager running (Title IV-DD. Lgs.81/2008 and 106/2009) of the work of "installing new boiler of 65 t / h and produced works of adaptation."
Works Management and Construction Manager running (Title IV-DD. Lgs.81/2008 and 106/2009) of the work of "installing new units of EDC vapor abatement of dock-B platform."